24cavity plastic cap mould
Detail
| Cap Mold Feature |
| 1. Adopt imp0rted steel P20, Germany 2316, S136 etc. |
| 2. Each cavity and core have independent cooling system, BeCu add in the core of mold, shortening production cycle time. |
| 3. Rational mold design to extend mold life and get high production efficiency. |
| 4. Mirror hand polishing and mold plates chroming to create added-value. |
| 5. Precision Machining to ensure high production efficiency & fine parting line effect. |
| 6. Skilled Language in communication and experienced in international standard. |
| 7. Hot runner system: China advanced brand or imp0rted hot runner system brand. |
| Each cavity has independent temperature control and heater system. |
| 8. Anti-theft cap mold or based on customer's design. |
| 24cavity plastic cap mould | |
| 1.R&D | We support customer R&D. Make the files or improve the design if you needed. |
| 2.Quotation Making | Mould Quotation will be finished in 1 day according to information we get. |
| 3.Negotiation | The quality, price, material, delivery time, payment item, etc. |
| 4.Mould Design | 1-2days for product 3D/2D drawing design as per customer's design or our company's design. Then in further make the mould 2D/3D design. |
| 5.Mould | 1. confirm the proucts and the mold design |
| 2. Mould material prepare | |
| 3. Rough machining(heat treatment on mold base and pre-harden on mold) | |
| 4. CNC/ Vacuum Hardening on mold main spare parts | |
| 5. finishing machining( JDPAINT, DEM.etc) | |
| 6. Dimension inspection | |
| 7. Ejector& runner& cooling & other device process | |
| 8. Assemble mold | |
| 6.Mould Testing | When moulds are finished, we will test the mould and we will send samples for consumer reference. |
| 7. Sample confirmation | If the first sample is not satisfied by customer when it is come out. We modify the mould and until meet customer’s satisfaction. |
| 8.Delivery | Delivery goods by sea or by air, according to customer’s requirement. |